How to Write an EPP Foam RFQ: A Spec Sheet Checklist for Sourcing Teams

“ An RFQ is not a request for a price, it is a request for a commitment expressed as a number. This guide sets out the six inputs a moulder needs before any figure means anything, the drawing and tolerance language that survives a contract, the tooling terms that decide who owns what in year three, and the freight arithmetic that makes a foam quote comparable. Includes a fourteen-item document checklist, a one-page RFQ template, and the six questions to send back to every supplier. ”
Overview
An RFQ is not a request for a price. It is a request for a commitment, expressed as a number. The document you send decides whether five suppliers quote the same part or five subtly different parts — and no amount of negotiation afterwards repairs a comparison that was never a comparison.

Most EPP sourcing projects that go wrong do not go wrong in the mould. They go wrong in the first email. A moulder who receives “we need EPP foam inserts, like the photo, how much?” has three options: price the cheapest possible reading of the photo, price a guess, or write back with eleven questions and lose a week. All three cost the buyer money, and only one of them is visible in the quote.

This article is about the input document — the RFQ package and the terms inside it. It is deliberately not about the other three questions buyers usually ask first. If you want to understand why one quote is higher than another, that is the cost structure of a moulded EPP part. If you want to know whether the parts that arrive are to specification, that is dimensional tolerances and quality control. If you want to know how the tool itself is built, that is EPP mould tooling. This one answers a narrower and earlier question: what has to be written down before any of those answers mean anything.

Why most foam enquiries come back uncomparable

Before fixing the document, it helps to name what usually goes wrong with it. Six failure modes account for almost every RFQ that produces numbers nobody can rank.

  1. A photograph instead of geometry. A picture communicates intent. It does not carry a wall thickness, a draft angle, a tolerance or a datum. Every supplier who quotes from a photo is pricing a solid he reverse-engineered himself, and every one of them reverse-engineered a different solid.
  2. A density number with no property behind it. “EPP 30” states how much polymer sits in a cubic metre. It says nothing about how the part behaves under load. Two moulders can both deliver 30 kg/m³ and hand you parts that perform differently, because bead grade, fusion and density distribution differ.
  3. No annual volume. Tooling amortisation, cavity count and machine scheduling all key off volume. Withhold it and the supplier prices the tool as a standalone purchase and the part at his most conservative rate.
  4. Tolerance language lifted from a machined-metal drawing. “±0.2 mm” on a moulded bead part is not a tolerance. It is a dispute with a delayed start date.
  5. No delivery basis. At 30–40 kg/m³ foam is volume-limited, not weight-limited, so a part price without packaging, pallet and Incoterm is not a landed price. See the freight section below.
  6. Silence on tooling ownership. The most expensive silence in foam sourcing, and the one that surfaces three years later when you try to move the part.

Fix those six and the clarification traffic drops by an order of magnitude. The rest of this article is the replacement text.

The six inputs a moulder needs before a number means anything

1. Geometry
A closed solid for the shape, and a drawing for the intent: datums, critical dimensions, parting line, cosmetic faces.
2. Material
Density plus the property that density is supposed to deliver, with the test standard that settles it.
3. Volume
Annual demand, call-off size, forecast horizon and ramp — the four numbers that set cavity count and price.
4. Tolerance
Per dimension class, with the measurement conditions. Not one blanket figure for the whole part.
5. Tooling terms
Ownership, cavitation, payment milestones, life, maintenance, revision policy and transfer.
6. Commercial terms
Incoterm and named place, packaging, pallet limits, container utilisation, samples, documentation.

Input one: geometry — a STEP file is a start, not a specification

Send STEP AP242 (ISO 10303-242) if your CAD system produces it, or AP214. Both carry a true solid. IGES loses solid identity on complex foam geometry and STL is a mesh — usable for a CNC prototype, useless for a toolpath on a mould.

What the 3D model has to carry, before anything else is discussed:

  • One watertight solid per part, single body. Not a surface quilt, not an assembly of six bodies, not a shelled shell.
  • Units in millimetres, positioned in a sane coordinate system. Every mould shop has received a model in inches at some point and priced a part twenty-five times too large.
  • The model at nominal size, with no shrinkage compensation applied by you. See the warning below.
  • Logos and lettering modelled as solids, or omitted here and specified on the drawing with a depth. A flat image dropped on a curved surface will be interpreted six different ways.
  • No decorative features you would not pay to mould. Every rib, step and undercut in the solid becomes tooling time.

The drawing does what a solid cannot: it carries decisions. A STEP file tells a moulder where the material is; a drawing tells him which surfaces matter and what he will be judged against.

Drawing elementWhat to writeWhy the moulder needs it
Datum schemeA / B / C on functional surfaces — not on the parting lineEvery measurement, every fixture and every first-article report is referenced to these
Critical dimensionsAim for 6–12, marked CC or with a symbolThese are the ones he will put on the T1 report and defend in the PPAP
ToleranceIndividual tolerance per critical dimension; a general note for everything elseDrives tool build, inspection method and, honestly, whether he accepts the job
Draft and parting lineState the acceptable parting line location and any visible witness mark limitA parting line across a visible face becomes a cosmetic rejection six weeks later
Wall thicknessNominal and minimum, called out separatelyBead fill, cycle time and weight all follow wall thickness
Colour, texture, glossColour reference (e.g. RAL or a physical master), texture grain, gloss levelSeparate tooling, separate material and separate cost — never a footnote
Assembly interfacesMating part number and the fit that matters (clearance, interference, flush surface)The tolerance stack is decided here, not at the mould
A 2D drawing is not bureaucracy. It is the only place where “as designed” can be distinguished from “as moulded”.
Never pre-scale the model for shrinkage
EPP shrinks on cooling, typically somewhere in the 1.5–2.5 % linear range, and the figure moves with density, bead grade, mould temperature and part geometry (indicative — your moulder's own trial data governs). That shrinkage is compensated in the cavity, not in the drawing. If you send a model that is already scaled up, the moulder applies his own factor on top and the part arrives undersize with no one to blame. Send nominal, and ask him to declare the shrinkage factor he used, and to prove it on the first article.

One phrase does a lot of work on a foam drawing: as moulded. It signals that dimensions are measured on a part that has finished growing, not on a fresh cavity. Put the measurement conditions next to it — 23 °C, unrestrained, at least 24 hours after demoulding — because foam parts continue to move for hours, and two inspectors measuring at different ages will produce different numbers from the same part.

Input two: density is an outcome, not an input

“EPP 30” is a mass per volume. It is a useful cross-check and a poor specification. What the part has to do is carry a load, survive a drop, hold a temperature, resist a flame, dissipate a charge or stay inert in contact with food — and each of those is a property with a test method. If you want the density ladder itself, the guide to choosing EPP density from 20–80 kg/m³ covers it. Here the point is different: how to write the requirement so the answer can be checked.

What you actually needProperty to put on the RFQTest standardWhat a usable answer looks like
The part must not crush under a stacked loadCompressive stress at 25 % strain, plus compression setISO 844 · ISO 1856A value stated with the density and the conditioning — not a brochure range
The part must survive a dropDrop height, payload mass, orientation, and the pass criterionYour own protocol, or ISTA for the packed systemA test the supplier will run on T1 samples and report, with photographs
The part must insulateThermal conductivity at a stated mean temperatureISO 8301 · ASTM C518k at 10 °C or 23 °C mean — not “0.04” with no temperature attached
The part must resist flameRating, standard and the thickness testedUL 94 · ISO 9772 · IEC 60695-11-10A report at your wall thickness; ratings move with thickness
The part must dissipate staticSurface resistance, with the humidity and ageing conditionANSI/ESD S541 · IEC 61340-5-3A value with the conditioning stated — dry and aged is the worst case
The part must contact foodCompliance route and the declaration offeredEU 10/2011 with 1935/2004, FDA 21 CFR, or the Japan / Korea equivalentA Declaration of Compliance naming the grade, plus migration data
One line per requirement, one standard per line. A requirement with no standard is a preference, and it will be priced as one.
Three quotes, three different products
If the returned quotes sit at 25, 30 and 45 kg/m³ for the same function, that is not a pricing spread. It is three different engineering assumptions. Before comparing currency, ask each supplier what compressive stress his grade actually delivers at 25 % strain, and what he assumed for wall thickness. Two numbers on the same page are only comparable if the page describes the same part.

A note on colour, because it recurs. Black EPP may be pigmented black or filled with carbon black, and the two are not interchangeable — the carbon-filled grade changes electrical behaviour and can affect surface finish. Write the colour as a material requirement with a reference, not as an adjective, and never accept “any colour” as an answer to a question about performance.

Input three: the volume section most buyers leave blank

Volume is the single most under-specified field in foam RFQs, and it is the one that changes the price most. Cavity count, machine choice and whether the tool is invoiced once or amortised into the part all follow from it. A supplier with no volume has to assume the worst case for his own capacity, and he charges for that assumption.

FieldWhy the moulder needs itWhat to write
Annual demandSets cavity count and whether the tool is paid once or amortised12,000 pcs per year — and state your forecast accuracy, e.g. ±20 %
Call-off sizeSets how often the machine is set up and how much finished stock exists at any moment1,000 pcs per release, monthly
Forecast horizonWhether bead is bought in one lot or twelve, and at what price12 months rolling, 3 months firm
Ramp profileA new programme does not start at full rate2,000 / 6,000 / 12,000 over three quarters
End of lifeLast-time-buy planning and tool retirement4 years expected, then service parts only
SeasonalityPeak months may exceed machine capacity if the tool is single-cavity60 % of volume in Q3
The tolerance on your forecast matters more than the forecast itself. A supplier who knows the number may move by 20 % prices for the average; one who does not prices for the peak.

Now the arithmetic that decides how big a call-off should be, because it usually runs the opposite way to instinct. Take a packaging insert of 600 × 400 × 200 mm: 0.048 m³ per part. Annual demand of 12,000 parts is 576 m³ of product — eight 40-foot containers before any packing inefficiency. That is the defining fact about buying foam: you are not buying mass, you are buying space, and space is what you pay to store and to ship.

Call-offSet-ups per yearSet-up cost per partAverage finished stockInventory cost per part
500 pcs24€0.060250 pcs — 12 m³€0.036
1,000 pcs12€0.030500 pcs — 24 m³€0.072
4,000 pcs3€0.0082,000 pcs — 96 m³€0.288
Illustrative model only, not a quotation. Assumes a set-up cost of €30 per run across 12,000 parts per year, and warehouse space at €3 per m³ per month.

The large batch is 87 % cheaper per part on set-up and roughly three times more expensive once storage is counted. For a dense machined component the set-up line would dominate and the big batch would win. For bulky foam the cube dominates, and the RFQ is where you decide it — not in a warehouse argument eighteen months later. Set the call-off from your space, not from the moulder's convenience, and say so in the document.

Input four: tolerance — write something a gauge can settle

Two phrases account for most tolerance disputes on EPP parts: “±0.5 mm” and “per ISO 2768-m”. Both were inherited from machined metal. ISO 2768-1 class m on a 100 mm dimension allows ±0.3 mm. A moulded bead part will not hold that, and a supplier who accepts it has either not read the drawing or intends to argue when the report arrives. Unlike machining, there is no single general-tolerance standard that governs moulded EPP: the tolerances are agreed between moulder and customer, which means they have to be written rather than referenced.

Dimension classWhat it coversIndicative as-moulded capabilityHow to measure it
Interface / fitMating with another moulded or machined partThe tightest band the process can hold — at best a few tenths of a millimetre, and only on modest part sizesCMM or a dedicated gauge, on the datum scheme
FunctionalClearance around a component, wall position, seat depthRoughly ±0.5–1 mm depending on part size and densityCaliper or height gauge, 24 h after demould, unrestrained
Cosmetic / freeNon-mating surfaces, draft-dependent facesLoosest class — ±2 mm or a profile tolerance is normalVisual check plus profile gauge
Assembly stackThe sum of several parts in a buildDo not tolerance a stack by summing worst cases if you can measure the assembly insteadCheck fixture on the assembled unit
Indicative only: real capability depends on part size, density, tool quality and where the dimension sits relative to the parting line.

Four sentence patterns that reliably cause disputes later:

  • “±0.5 mm all over” — no datum, no dimension class, no measurement condition. Unenforceable in both directions.
  • “Per ISO 2768-m” — a general tolerance for machined parts applied to a moulded bead part.
  • “Match sample” — which sample, approved by whom, on what date, at what age after demoulding?
  • “Straightness 0.2 mm” — measured on a part that is still moving and will be straighter tomorrow.

The clean alternative is five lines on the drawing: the datum scheme, six to ten critical dimensions with individual tolerances, a general note for everything else, the measurement conditions, and the acceptance document. The inspection side of that — what actually goes on a first article report and how to read it — is covered in EPP dimensional tolerances and quality control.

Input five: tooling terms, or the paragraph that prevents a year-three argument

Buyers treat tooling as a line item and negotiate it like a price. The money is rarely the problem; ownership is. How the tool is built and what it costs to run are separate questions, covered in EPP mould tooling: aluminium vs steel, T1 samples and cycle time. What belongs in the RFQ is the contract around it.

TermWhat to writeThe default if you stay silent
Ownership“Tooling is the property of Buyer, paid in full on T1 approval, and returned on request at Buyer's cost”Supplier owns it, and you rent access to your own product
Payment scheduleStaged, e.g. 40 % on order, 40 % on T1, 20 % on approval100 % up front, which leaves you no leverage at the only moment that matters
CavitationCavity count fixed; any change requires a new first article and a re-quoteSupplier may add cavities and call it the same part
Tool life and maintenanceExpected shots, who maintains, who pays for wear itemsUndefined — and a worn tool becomes a quality claim you lose
Revision policyEngineering changes quoted separately, with the cycle-time impact statedEvery change becomes a renegotiation
TransferTool condition on transfer, plus the documents handed over: drawing, process card, steam settings, shrinkage recordYou receive a steel block and none of the process knowledge
Every row here has the same shape: the cost of writing it is one sentence, and the cost of omitting it is measured in months.
The quiet trap is a free tool
If the tool is not invoiced, its cost is inside the part price and its ownership usually stays with the supplier. You then buy parts from a tool you cannot move, at a price you cannot benchmark, from a supplier you cannot replace. Free tooling is a financing arrangement, not a discount — it is entirely legitimate, but it must be recognised as one and priced against the alternative.

Two more lines worth adding while you are there. Ask what the T1 sample commitment is: how many samples, in which density and colour, with which report, and how many engineering loops are included in the tool price — usually none, occasionally one. And ask what happens to the tool if the programme is cancelled before SOP, because that clause gets read exactly once, at the worst possible moment.

Input six: commercial and logistics, where EPP quotes diverge most

Foam is manufactured by the cubic metre and sold by the piece, and the gap between those two units is where quotes stop being comparable. A part at 35 kg/m³ has a mass that is negligible next to the space it occupies, so container utilisation — not weight — sets the freight bill.

How it shipsWhat a 40HQ carriesWhat limits it
Bulk, un-nested, effective 35 kg/m³≈ 70 m³ / about 2.4 tVolume — you are paying to ship air
Nested or sleeved, effective 60 kg/m³≈ 4 tStill volume
Palletised, effective 120 kg/m³≈ 8 tStill volume
Densified (regrind or scrap, not finished parts)Payload limit, ≈ 26 tWeight
Indicative: 40HQ taken as ≈70 m³ usable volume and ≈26 t payload; effective density includes packing void. LCL bills on 1 m³ = 1,000 kg, air on 1 m³ = 167 kg, so both treat low-density foam as pure volume.

Two consequences for the document. First, state whether nesting and stacking are permitted, because it can change container utilisation by a factor of two and it is a design decision, not a packing decision. Second, state whether parts may be stacked in the same orientation for weeks — foam creeps under sustained load, and a container on a dock in July can reach temperatures where a stack of soft parts takes a permanent set.

The quote itself should state each of the following as a separate line, not bury them in a total:

  • Incoterm and named place, per Incoterms 2020. Note that FOB is sea-only, and the ICC now recommends FCA for containerised cargo — under FOB the container is already at the terminal when risk passes, which is not what most buyers think they bought.
  • Packaging: inner bag or none, dividers, pallet type and footprint, maximum stack height, stretch wrap, label content.
  • Container loading plan, or at minimum a stated utilisation percentage and whether the load is volume- or weight-limited.
  • Pallet cost and treatment: who pays, and whether ISPM 15 heat treatment is included for wood.
  • Samples: free or charged, courier paid by whom, how many, and at which stage.
  • Documentation: HS classification, certificate of origin, material declaration, and the compliance documents promised earlier.

The document pack: a checklist you can attach

Fourteen items. The right-hand column is what happens when the item is missing, which is the argument to use internally when someone asks why the RFQ has to be four pages.

#ItemWhy it mattersIf it is missing
1STEP solid (AP242 / AP214)Geometry is only unambiguous as a solidEvery quote prices a different reverse-engineered part
22D drawing with datums and critical dimensionsCarries the intent a solid cannotCosmetic and fit disputes at T1
3Density plus property plus test standardDensity alone is not performanceFive quotes, five different products
4Colour, texture and glossSeparate tooling and separate costColour becomes a change order
5Flame / ESD / food-contact requirement with standardCompliance is a document, not an adjectiveNon-conformance found at customs or in an audit
6Annual volume, call-off, forecast, rampDrives cavity count and amortisationConservative pricing, and a tool sized for nobody
7Target price or budget band (optional)Lets the supplier propose a design changeNo value engineering happens at all
8Tolerance table and measurement conditionsMakes acceptance objectiveThe year-three argument
9Verification plan: sample size, report format, approval routeDefines what “approved” meansApproval by email and memory
10Tooling terms: ownership, cavitation, payment, transferProtects the assetYou cannot move the part
11Packaging spec and pallet constraintsCube is the freight billRe-quote after the first shipment
12Incoterm, destination, delivery frequencyLanding costQuotes you cannot rank
13Quality system expectation and audit rightsSupplier selection, not just part selectionSurprises in year two
14NDA and IP statement if the design is yoursDesign protectionYour drawing circulates
Items 1–5 define the product. Items 6–14 define the deal. Both halves are needed before a number is meaningful.

How to compare quotes that do not look alike

Five quotes for “the same” part will not be the same offer. Normalise before ranking, in this order:

  1. Fix the volume. Ask every supplier to price the same annual volume and the same call-off. A quote at 50,000 pieces against one at 5,000 is not a comparison.
  2. Separate the tool from the part. Tool price and part price trade against each other; a cheap tool with an expensive part is a financing arrangement wearing a discount.
  3. List what is excluded. Packaging, pallets, freight, tool maintenance, colour changes, certificates, samples, engineering changes. Exclusions are where quotes actually differ.
  4. Convert to landed cost per 1,000 parts at your door, using your real cube and your real duty rate.
  5. Check the assumptions behind density and tolerance. If one supplier assumed 25 kg/m³ and a looser tolerance, he is quoting a different product at a fair price for it.

Six questions worth sending to every supplier before you decide anything:

  • What density and bead grade did you price, and what compressive stress does it deliver at 25 % strain?
  • What shrinkage factor did you apply, and how was it established — in-house trials, or a table?
  • What tolerance table are you committing to, and how will you measure each class?
  • How many cavities, and what cycle time did you assume?
  • What is included in the tool price — first article, one engineering change, or neither?
  • What would move your price by more than 10 %?
The last question is the most informative
A supplier who can answer “what would move your price by more than 10 %” knows his own cost structure: he will name the bead price, the machine hour, the container, or the number of moulding starts. A supplier who cannot answer it is quoting a number he will revisit the moment reality intervenes — which is usually after you have paid for the tool.

A one-page RFQ template

If the checklist is too long to start with, start with these twelve lines. They fit on one page and they will get you comparable numbers.

  1. Part name, drawing revision, programme, target SOP date.
  2. STEP file name and revision; drawing number and revision.
  3. Material: grade family, density, colour, and any flame, ESD or food-contact requirement with its standard.
  4. Functional requirements, one line each: what load, what drop, what temperature, what chemical contact.
  5. Critical dimensions, and a reference to the tolerance table.
  6. Annual volume, call-off size, forecast horizon and ramp.
  7. Tooling: cavity count wanted, ownership position, payment milestones.
  8. Samples: how many, at which stage, with which report.
  9. Packaging: unit pack, pallet, maximum height, label content.
  10. Delivery: Incoterm and named place, destination, frequency.
  11. Quality: report format at T1, PPAP-equivalent level required, audit rights.
  12. Commercial: currency, payment terms, price validity, and whether alternative design proposals are welcome.

That last line is underrated. A moulder who is invited to propose a change will sometimes find a 15 % saving in a rib that was never needed or a wall that was thicker than the load required. A moulder who is handed a frozen drawing will simply quote it, and you will never learn what the other version cost.

What a competent supplier will ask you back

The reply is as diagnostic as the quote. These are the questions a moulder asks when he intends to be responsible for the part:

  • Where does this part sit in the assembly, and what does it touch on each side?
  • Which surfaces are visible to the end user, and which are hidden?
  • If this dimension is 1 mm out, does the assembly still close?
  • Is the annual volume firm enough to justify a multi-cavity tool, or would a single cavity be more honest?
  • Who owns the design, and am I allowed to propose a change?
  • Is there an incumbent part or material we are being compared against, and what did it fail at?
  • What is the failure you are trying to design out — impact, load, heat, or cost?

If a supplier asks none of these, he is quoting a commodity and will deliver a commodity. If he asks all seven in his first reply, you are dealing with a moulder rather than a trader, and that is worth more than a four per cent price difference. It is also a reasonable proxy for how he will behave when a tool needs rework in month nine.

Red flags in a returned quote

  • A price with no density, no bead grade and no tolerance stated.
  • A tool price with no cavity count, no sample commitment and no statement of what is included.
  • “Any colour” or “any density” offered as an answer to a performance requirement.
  • A delivery date shorter than the tool build time — typically weeks, not days, for a new cavity.
  • A quote that quietly improves the design: thinner wall, no draft, fewer ribs, no radii.
  • Certification claims with no report number and no test house named.

Where this leaves the sourcing team

None of the above requires a materials engineer. It requires the discipline of writing down what was already decided in the design review, in a form a supplier can price and an inspector can measure. The product itself is not complicated: moulded EPP is a mature process, and the parts on our product pages and in application-specific components are made from the same material under the same constraints.

What varies is the quality of the brief. A four-page RFQ with a drawing, a tolerance table and a volume table will produce comparable quotes inside a week. A photograph and a sentence will produce five numbers, three months, and a tool nobody wants to own. If you are still at the stage where the shape is not final, say so — CNC prototype and sample routes exist precisely so that a tool is not cut against a guess.

Can I just send a 3D file and let the supplier work out the rest?

You can, and you will get a quote for his interpretation of it. The drawing carries the decisions that a solid cannot express: which dimensions are critical, which faces must be clean, where the parting line may sit, and what tolerance applies. Without it, those defaults belong to the supplier, and so does the argument later.

What density should I specify in the RFQ?

Specify the function first and let the density follow. State the load the part must carry, the drop it must survive, the temperature it must hold, and the standard test that settles each one. Then ask the supplier which density he recommends and why. The working range for moulded EPP is roughly 20–80 kg/m³; choosing within it is an engineering decision, not a purchasing one.

Is ±0.5 mm a reasonable tolerance for moulded EPP?

Not as a blanket figure. As-moulded foam holds a few tenths of a millimetre at best on interface dimensions, around ±0.5–1 mm on functional features, and millimetres on free surfaces. Write the tolerance per dimension class, with the measurement conditions, and expect the moulder to push back on anything tighter than his process can hold — that push-back is a good sign.

Do I have to pay for the tool up front?

Common structures include full payment on T1 approval, or a staged split such as 40 % on order, 40 % on T1 and 20 % on approval. What matters more than the schedule is that ownership, cavitation, maintenance responsibility and transfer rights are written into the RFQ. A tool you paid for but cannot move is not an asset.

How long should an EPP quote take?

For a part that needs a new tool, a few working days is normal once the package is complete. Three weeks usually means the RFQ was missing something the supplier had to reconstruct — geometry, volume or tolerance. The clock starts when the drawing is clear, not when the email is sent.

What is a normal MOQ for moulded EPP parts?

MOQ is not a policy, it is an anchor. Ask what it is anchored to: a minimum machine run, a colour change and the purge that comes with it, a bead lot, or a minimum economic tool run. Once you know the anchor, you know which lever moves it — and whether a larger call-off is worth the warehouse space it consumes.
Send the drawing, not the photograph
We mould custom EPP and ETPU components for packaging, automotive and industrial assemblies, and we quote from a STEP file and a drawing. Send both with your volume and tolerance expectations — you will get a quote that states the density, the shrinkage factor, the cavity count and what the tool price includes, so it can be compared with anything else on your desk.
Send your RFQCustom moulded partsRead the FAQ
How to Write an EPP Foam RFQ: A Spec Sheet Checklist for Sourcing Teams
An RFQ is not a request for a price, it is a request for a commitment expressed as a number. This guide sets out the six inputs a moulder needs before any figure means anything, the drawing and tolerance language that survives a contract, the tooling terms that decide who owns what in year three, and the freight arithmetic that makes a foam quote comparable. Includes a fourteen-item document checklist, a one-page RFQ template, and the six questions to send back to every supplier.
Long by picture save/share
Qingdao Simingrui Precise Technology Co., Ltd

Contact us

 

East side of Jiaoping Road, Madian                Industrial Park, Jiaozhou City, Qingdao           City, Shandong Province

+86-15588637956

market@qd-smr.com

Product Category

分类标题

Message consultation

  • Email

  • Telephone

  • Message

  • Submit message

  • Security Code
    Refresh the code
    Cancel
    Confirm
图片展示

East side of Jiaoping Road, Madian Industrial         Park, Jiaozhou City, Qingdao City, Shandong         Province

+86-15588637956

market@qd-smr.com

Copyright Qingdao Simingrui Precise Technology Co.Ltd All rights reserved.

Copyright Qingdao Simingrui Precise Technology Co.Ltd All rights reserved.

Hello,Contact us if you have any questions!
Add WeChat friend to learn more about the product
Use Enterprise WeChat
"Scan" to join the group chat
Copy success!
Add WeChat friend to learn more about the product
I see.